A320 WALK AROUND.WMV

A320 WALK AROUND.WMV Video Clips. Duration : 11.67 Mins.


Maintenance || A320 Type Course: Maint. External visit. Air Arabia Engineering www.facebook.com ====================================== This film presents the A321 outside safety inspection and cockpit Check-List (CL) to be performed before powering the A/C for maintenance purposes. Various main stations have been defined. The inspection starts with the nose station. First verify that the NLG chocks are in place. Then, observe that the NLG doors are closed. Make sure that the NLG safety pin is installed. The NLG steering pin must be as required. Finally, verify that the A/C is electrically grounded. The second step consists of inspecting the right MLG. Start by checking that the MLG door is closed. Then, verify that the MLG safety sleeve is installed. Lastly, observe that the MLG chocks are in place. Let us continue with the right engine station, the first thing to do is to make sure that the engine right side access doors are secured. The same must be done for the left side. Check that the engine fan cowls and thrust reverser cowls are secured. The right wing is the 4th station. Observe the position of the slats and then, the flaps. The spoilers must be retracted. Then move to the left wing station. Here again observe the position of the flaps and then, the slats. Although make sure that the spoilers are retracted. The next step is the left engine station. Check that the engine right side access doors are secured. Then pass around the engine to verify that the left side ...

0 comments:

Post a Comment